Work Type: Scheduled Repair
Risk Level: Critical
Impact: MEDIUM IMPACT works (Level 2)
During Works: No impact expected however redundancy reduced
Details: We do not expect any impact, the customer load will be supplied via UPS during the mains power lost until the generators take over. The generator redundancy is N+4 at expected total laod of 8MW. The mechanical system will be impacted like the chillers, dry coolers and half of crah units until the generators took over the load.